Wilmington Boys And Girls Club Outdoor Multipurpose Sports Court Project

    NOTICE OF INVITATION TO BID

     

    FOR THE WILMINGTON BOYS AND GIRLS CLUB

    SPORTS COURT PROJECT

    at

    1444 W. Q St.
    Wilmington, California 90744

    for

    Boys and Girls Clubs of the Los Angeles Harbor

    1200 S. Cabrillo Avenue

    San Pedro, CA 90731

     

    Date of Issue: July 17, 2019

     

    The Boys and Girls Clubs of the Los Angeles Harbor is accepting bids for the Wilmington Boys and Girls Club Sports Court and Gym Improvements Project at 1444 W. Q St., Wilmington, California  90744.

    Work will include:

    1) Installation of an outdoor sport court including demolishing an existing parking lot, grading, and installation of a colored asphalt base sport court with striping, rubber coated fencing, two (2) futsal goals and four (4) basketball goals, signage to direct youth, a stormwater unit, and a new ADA accessible curb ramp at the sidewalk;;

    Bidders must possess a valid State Of California Contractor’s License Classification “B”. A 100% Performance & Payment Bond and a 10% Bid Bond are required. The selected contractor will be required to obtain any required building permits. Building permit fees will be paid by the Boys and Girls Clubs of the Los Angeles Harbor. State Prevailing Wage provisions are applicable to this project.

    A mandatory pre-bid meeting will be held at the project site on:


    August 6, 2019 @ 10:00 a.m

    at

    1444 W. Q St.

    Wilmington, California  90744.

    Sealed bids must be submitted on forms provided in bid packages and are due no later than:


    4:00 pm on August 27, 2019

    The bid due date for the Wilmington Boys and Girls Club Sport Court Improvement project will be extended to 4:00 pm on September 19, 2019.


    Bid packages and construction plans and specs can be downloaded below, and are to be submitted to:

    Mike Lansing

    Boys and Girls Clubs of the Los Angeles Harbor

    1200 S. Cabrillo Avenue

    San Pedro, CA 90731

    For any questions please email the project manager, Griffin Wright, Urban Design Center, at:

    bgcw@urbandesigncenter.com

    The deadline for the receipt of written questions is August 21, 2019. Questions will not be answered directly. All questions will be compiled as Requests for Information (RFI) and the questions and answers will be posted on the project bid website.

    The Boys and Girls Clubs of the Los Angeles Harbor, with the concurrence of the City, reserves the right to reject any or all such bids and to waive any informality in the bid.

     

    Project Documents:

     


    Addendums



      RFI Questions and Answers